- General
- North Arrow
- Street Name
- Centerline
- Name
- Date
- Substructures
- Gas, Oil, Steam (Yellow)
- Electric (Red)
- Communications (Orange)
- Potable Water (Blue)
- Reclaimed Water (Purple)
- Sewer/ Drainage (Green)
- Survey Marks (Pink)
- Proposed Excavation (WHITE)
- Vaults (Dimensions)
- Handholes (Dimensions)
- Manholes (Dimensions)
- Footage
- Centerline Station
- Face-of-curb Distance
- Above Ground
- Street Lights
- Trees
- Utility Poles
- Utility Boxes
Things to note for substructure:
The substructure lines should be continuous. E.g. Try to connect the gas lines across the street. In one continuous line rather than having two lines with a break.


