ECS Project Deliverables

  • SpidaMin Commit
    • SPIDA file
      • As Is
      • As Designed
      • SAP Tab filled
    • Zip folder
      • Soft copies
        • Scanned/ Digital Pole Loading Worksheet with proposed in RED
        • PDF pictures (mist be in landscape)
          • Pole Tag
          • Brand
          • Base
          • Elevation x2
          • Anchors
      • End of Project Summary
  • Traffic Controls
  • Civil Drawings
  • Work Order Maps/ Cable Maps
  • Scoping Sheet

Also See: ECS Design Standards